EPC 01/01 2022 — 30/12 2023

Construction of a Boosting Compressor Station at Arniyoz field

Projects

FE Sanoat Energetika Guruhi LLC (SEG)

Project goal

Construction of a complex of Boosting Compressor Station facilities to ensure the necessary preparation of reservoir energy when supplied from low-pressure oil and gas wells of TPP “Mubarek” to the designed GTP (complex gas supply unit) “S. Muymanak”.

Performed work

Design, construction and supply of a booster compressor station with a total capacity of 4.8 million st. m3/day of gas pumping unit — GCU in the amount of 2 pcs. (each for 2.4 million st. m3/day), as well as more than 20 pieces of equipment that are part of the gas compression system.